KABELSCHLEPP Metool designs complete solution for a heavy duty crane system Moving high loads at open sea: solid stainless steel drag chain proves successful under extreme conditions

KABELSCHLEPP Metool designed and implemented a solid stainless steel drag chain including a support structure for a rotating tower crane from AXTech, used on the gigantic multi-function vessel “North Sea Giant” in the offshore business. The resulting solution takes into account the limited packaging spaces and extreme requirements of this application and has been used successfully for 2.5 years. This was made possible by close cooperation with the customer, advanced 3D simulations during the design engineering phase and, last but not least, extensive testing under realistic conditions.

With a lifting capacity of 420 tons, the innovative SHS Tower Crane from the renowned Norwegian manufacturer AXTech allows installation and maintenance of subsea systems and technical equipment in the North Sea: with a motion radius of 180°, it can lift heavy equipment and systems from the ship’s deck and into the sea. 15 hydraulic hoses with a working pressure of 450 bar ensure supply to the crane. Due to the rotating motion of the crane, it is necessary to guide the hoses during the movement. This is ensured by a customized drag chain from KABELSCHLEPP Metool. The crane system is operated and maintained by TechnipFMC, a global leader in oil and gas projects.

 

The entire system was installed and tested under the strictest safety measures at TSUBAKI KABELSCHLEPP during a factory acceptance test

The function and – most importantly – the safety of the entire facility depends crucially on the energy supply to the crane. Designing suitable cable carriers is consequently a demanding task: This application involves varying loads of up to 400 tons – a challenge which is made even more difficult by the extreme conditions on the open sea. The background: The drag chains are positioned at the base of the crane, only a few meters above the water’s surface, and therefore regularly fully exposed to the salt water. At the same time, they have to function without interruptions even under extreme weather conditions. Another important factor is a high level of stability of the cable carriers, taking into account the ship’s motion in rough seas.

 

The overall solution developed by KABELSCHLEPP Metool using 3D simulations meets all these requirements – demonstrably, as the cable carrier was tested extensively and deemed suitable during a factory acceptance test before commissioning.

 

KABELSCHLEPP Metool also achieved top marks for the design of the entire drag chain system: the steel structure was pre-assembled on land and then lifted onto the ship with only 3 lifting cycles. This allowed assembly time on the ship to be reduced to a few days.